Name of the Equipment | QE & IV System |
Group | Education and Training |
Category | clean |
Operator | |
System Owner | |
Make / Model | Holmarc |
Information | No |
Serial Number | |
FootPrint | |
InstallationDate | |
Equipment Type | Deposition, Growth and Annealing systems |
Location | NCPRE students fabrication lab Second floor, Transit building |
AMC | Required |
Local Dealer |
|
Actual Dealer |
|
SOP | |
Training & other policy documents | |
Recipies | |
Glimpse | |
Tool Facilities Requirements | |
Access | Controlled |
Lab Phone No | 3577 |
Substrate allowed | |
Substrate Dimension | |
Chemical allowed | , |
Precursors/ Targets available *Based on stock availability | |
Precursor/ Target loaded inside tool | 4 |
Target dimension | |
Gases allowed | |
Contamination remarks | |