Name of the Equipment | Tube Cleaning setup |
Group | Education and Training |
Category | clean |
Operator | |
System Owner | NCPRE Admin ncpreit@ee.iitb.ac.in |
Make / Model | Indigineous |
Information | No |
Serial Number | |
FootPrint | |
InstallationDate | |
Equipment Type | Wet chemistry tools |
Location | NCPRE students fabrication lab Second floor, Transit building |
AMC | Required |
Local Dealer | NA Indigenious instrument |
Actual Dealer | NA NA |
SOP | SOP/24_SOP.pdf |
Training & other policy documents | |
Recipies | |
Glimpse | |
Tool Facilities Requirements | Exhaust, Di water, Fume hood |
Access | Open |
Lab Phone No | 3577 |
Substrate allowed | Quartz tube |
Substrate Dimension | NA |
Chemical allowed | 2 % HF, NA |
Precursors/ Targets available *Based on stock availability | NA |
Precursor/ Target loaded inside tool | 4 |
Target dimension | NA |
Gases allowed | NA |
Contamination remarks | Clean |